Automation in Manufacturing | week 1 Solutions | Mechanical Engineering | swayam course | sept 2020

 

Swayam

Mechanical Engineering


Automation in Manufacturing


Week 1 

 

1) The duration of start of the development of a product to its decline of sales in the market is called _________________.

 A. Product-life cycle

 B. Product-development cycle

 C. Product-completion cycle

 D. Product-promotion cycle

Score: 1

Accepted Answers:

A. Product-life cycle

 

2) Mechatronics can_______.

 A. Enhance the mechanics of a machine

 B. Replace the mechanics of a machine

 C. Both enhance or replace the mechanics of a machine

 D. None of the above

Score: 1

Accepted Answers:

C. Both enhance or replace the mechanics of a machine

 

3) The branch of the engineering that deals with the emission, flow and control of electrons in vacuum and matter is called__________________.

 A. Systems engineering

 B. Control engineering

 C. Electronics engineering

 D. Electrical engineering

Score: 1

Accepted Answers:

C. Electronics engineering

 

4) Use of a micrometer by a quality control inspector to measure the diameter of a machined shaft is an example of __________________.

 A. Manual work system

 B. Worker-machine system

 C. Automated system

 D. Cellular manufacturing system

Score: 1

Accepted Answers:

A. Manual work system

 

5) A machine is a combination of rigid or resistant bodies connected each other. It provides ______________.

 A. Only motion

 B. Only forces

 C. Both motion and forces

 D. None of the above

Score: 1

Accepted Answers:

C. Both motion and forces

 

6) In _______________________ system, a periodic attention of the worker in the manufacturing operation is required.

 A. Manual work system

 B. Worker-machine system

 C. Automated system

 D. Cellular manufacturing system

Score: 1

Accepted Answers:

C. Automated system

 

7) In the context of various production systems, the assembly of automotives on the moving conveyor is one of the examples of ______________ systems.

 A. Single production machine

 B. Production line

 C. Multi-line manufacturing

 D. Flexible manufacturing

Score: 1

Accepted Answers:

B. Production line

 

8) In a typical production system, the planning and controlling of production orders will be handled by _____________________.

 A. Worker-support system

 B. Order-support system

 C. Facilities-support system

 D. Manufacturing support system

Score: 0

Accepted Answers:

D. Manufacturing support system

 

9) In ____________________ type of production system, a human-worker operates powered equipment such as machine tools or other production machines.

 A. Manual work system

 B. Worker-machine system

 C. Automated system

 D. Cellular manufacturing system

Score: 1

Accepted Answers:

B. Worker-machine system

 

10) In the smart technology enabled devices, the gyroscope sensors are used to measure________________.

 A. Angular rotational velocity

 B. Displacement

 C. Amplitude of vibration

 D. Torque

Score: 1

Accepted Answers:

A. Angular rotational velocity