Swayam
Mechanical Engineering
Automation in Manufacturing
Week 1
1) The duration of start of the development of a product to
its decline of sales in the market is called _________________.
A. Product-life cycle
B.
Product-development cycle
C. Product-completion
cycle
D. Product-promotion
cycle
Score: 1
Accepted Answers:
A. Product-life cycle
2) Mechatronics can_______.
A. Enhance the
mechanics of a machine
B. Replace the
mechanics of a machine
C. Both enhance or
replace the mechanics of a machine
D. None of the above
Score: 1
Accepted Answers:
C. Both enhance or replace the mechanics of a machine
3) The branch of the engineering that deals with the
emission, flow and control of electrons in vacuum and matter is
called__________________.
A. Systems
engineering
B. Control
engineering
C. Electronics
engineering
D. Electrical
engineering
Score: 1
Accepted Answers:
C. Electronics engineering
4) Use of a micrometer by a quality control inspector to
measure the diameter of a machined shaft is an example of __________________.
A. Manual work system
B. Worker-machine
system
C. Automated system
D. Cellular
manufacturing system
Score: 1
Accepted Answers:
A. Manual work system
5) A machine is a combination of rigid or resistant bodies
connected each other. It provides ______________.
A. Only motion
B. Only forces
C. Both motion and
forces
D. None of the above
Score: 1
Accepted Answers:
C. Both motion and forces
6) In _______________________ system, a periodic attention
of the worker in the manufacturing operation is required.
A. Manual work system
B. Worker-machine
system
C. Automated system
D. Cellular
manufacturing system
Score: 1
Accepted Answers:
C. Automated system
7) In the context of various production systems, the
assembly of automotives on the moving conveyor is one of the examples of
______________ systems.
A. Single production
machine
B. Production line
C. Multi-line
manufacturing
D. Flexible
manufacturing
Score: 1
Accepted Answers:
B. Production line
8) In a typical production system, the planning and
controlling of production orders will be handled by _____________________.
A. Worker-support
system
B. Order-support
system
C. Facilities-support
system
D. Manufacturing
support system
Score: 0
Accepted Answers:
D. Manufacturing support system
9) In ____________________ type of production system, a
human-worker operates powered equipment such as machine tools or other
production machines.
A. Manual work system
B. Worker-machine
system
C. Automated system
D. Cellular
manufacturing system
Score: 1
Accepted Answers:
B. Worker-machine system
10) In the smart technology enabled devices, the gyroscope
sensors are used to measure________________.
A. Angular rotational
velocity
B. Displacement
C. Amplitude of
vibration
D. Torque
Score: 1
Accepted Answers:
A. Angular rotational velocity
Comments
Post a Comment